Villa Renovation
Villa and house renovation in Al Ain, from one room to a full refurbishment. Civil, MEP, joinery and finishes under one engineer-led team. Free survey.
Reef Al Ghadeer handles bathroom renovation in Al Ain from strip-out to handover: new pipework, waterproofing, tiling, vanity units, sanitary ware and glass screens, all by one team. We survey the room for free and give you an itemised written quote. Call or WhatsApp Sunday to Friday, 8am to 5pm.
A bathroom looks finished long before it is. The tiles, the vanity and the glass screen are what you see, but whether the room lasts depends on the pipework and the waterproofing hidden under them. That is where we spend most of our care.
We renovate bathrooms in villas and apartments across Al Ain, from a single en-suite to every bathroom in the house. One team does the plumbing, electrics, waterproofing, tiling, joinery and fittings, so nobody is waiting for another contractor to turn up.
Every bathroom is different, but a full renovation usually covers:
If you only need part of this, such as new fittings on sound tiles, we will tell you so. Not every tired bathroom needs stripping back to the slab.
Tiles and grout do not keep water out. Grout is porous, and water gets through it every time you shower. The waterproof layer underneath does the real work, and when it fails, the leak shows up in the ceiling below, in the wall behind, or as tiles that start to sound hollow.
Waterproofing fails for a few common reasons:
Leaks inside walls also bring mould. The US EPA's guide to mould and moisture says the water source has to be fixed and wet materials dried within 24 to 48 hours, which is why we find the leak before we talk about new tiles.
Porcelain is the safe choice for floors and showers. It absorbs very little water, cleans easily and comes in large formats with fewer grout lines. For shower floors, choose a tile with some grip.
Natural stone and marble give a bathroom its character, and much of the finished work in our gallery is marble and stone. Marble is softer and more porous than porcelain, so it needs sealing and gentle cleaners. Acidic cleaners and limescale removers can dull a polished surface.
Vanity units can be fitted cabinets, floating units or solid marble counters with one, two or three basins. Under a basin, cabinets must be made from moisture-resistant board with every edge sealed, or they swell the first time there is a leak.
Hard water. Water in many Al Ain homes leaves limescale on glass screens, taps, shower heads and grout. Larger tiles with fewer grout lines, clear glass that you can squeegee, and good quality taps and shower heads all make it easier to live with. A water softener on the supply is worth asking a plumber about if the scale is heavy.
Heat. Bathrooms on an outside wall get hot in summer, and pipes running through a hot roof space can deliver warm water from the cold tap. We take this into account when we plan where the pipes run, and we use adhesives and sealants suited to the temperatures here.
You can see finished marble vanities, stone counters and complete bathrooms in our renovation projects in Al Ain gallery.
How long a bathroom takes depends on its size, the layout changes and the materials, so we give you a programme with the quote. What does not change is the order of the stages.
| Stage | What happens | Trades involved |
|---|---|---|
| 1. Survey and design | Measure the room, check the pipes, drains and any leaks, agree the layout, tiles and fittings | Engineer, plumber |
| 2. Strip-out | Remove old tiles, fittings and screed down to a sound base, take the waste away | Civil team |
| 3. First fix | New supply and waste pipes, cables for lights and fan, boxes for valves | Plumber, electrician |
| 4. Screed and falls | Level the floor with a fall to the drain | Civil team |
| 5. Waterproofing | Membrane on floor and shower walls, reinforced at corners, drain and pipes, then left to cure | Civil team |
| 6. Tiling | Walls and floor tiled, grouted, movement joints in silicone | Tiler |
| 7. Ceiling | Moisture-resistant gypsum ceiling, access panel, lights | Gypsum team, electrician |
| 8. Second fix | Vanity, WC, basin, shower, taps, glass screen, mirror and accessories fitted | Plumber, carpenter, glass fitter |
| 9. Test and handover | Check for leaks, test the drains and fan, clean, walk through with you | Engineer |
The curing time in stage 5 cannot be rushed. If you have only one bathroom, tell us at the survey and we will plan the work around it as far as the job allows.
We do not publish a price list, because two bathrooms of the same size can cost very different amounts. The main things that drive the price are:
We survey the bathroom for free, then give you an itemised written quote so you can see where the money goes and choose where to spend it.
Our gallery has before-and-after pairs from bathrooms we have stripped back and rebuilt, along with finished marble and stone vanity units. Look through our renovation projects, or ask us on WhatsApp for photos of a job like yours.
A bathroom is often the first step in bigger work. If you are also planning a kitchen renovation in Al Ain or a villa renovation in Al Ain, we can plan them together. As a renovation company in Al Ain, we cover every district, including bathroom renovation in Falaj Hazza.
Tiling and flooring · Plumbing · Gypsum ceilings · All renovation services
Send photos and rough sizes to 00971 56 391 3800, call or WhatsApp us, or request a free quote.
The cost depends on the room size, the tiles and fittings you choose and whether pipes are being moved. We measure the room and give an itemised quote.
The time goes on stripping out, waterproofing and letting it cure, tiling, then fitting the sanitary ware. Curing cannot be rushed. We give a programme with the quote.
Yes. The gallery has finished bathrooms, marble and stone vanity units and before-and-after pairs. Ask us on WhatsApp if you want to see a job similar to yours.
We can supply and fit everything, or fit tiles and fittings you have bought yourself. If you buy your own tiles, order extra for cuts and future repairs.
Not always. The leak may be a pipe, a waste joint or failed silicone, which can be repaired. If the waterproofing under the tiles has failed, the tiles have to come up to fix it properly. We find the source first and tell you which it is.
Porcelain tiles in large formats, with fewer grout lines, are easiest to keep free of limescale. Clear glass screens can be wiped dry after each shower. Avoid acidic limescale removers on marble, because they dull the polish.
No, the room is out of use from strip-out to handover. If it is your only bathroom, tell us at the survey and we will plan the stages to keep the time without it as short as the job allows.
Survey first, written quote second, work third. Nothing starts until you agree the scope and the price.